Lot KB-2627-04 · season 2026/27

Sidama Bensa natural G1.

Natural Sidama from Bensa, Sidama. Grade G1, screen 14+, cup 86 to 87 · range. Harvest November to January. Prices are given on enquiry.

Season coverage, format shown. The specification is representative until the lot is confirmed.

Hands holding a woven basket of ripe red coffee cherries over green leaves

The lot record.

What is on the record for this lot today. A field with no reading prints "not yet recorded" rather than a guess. Where published figures for the region disagree, the Sidama page prints the disagreement.

RefKB-2627-04
OriginSidama
Station or woredaBensa, Sidama
Station namenot yet recorded
Processnatural
GradeG1
Screen14+
Cup score86 to 87 · range
Cup notesnot yet recorded
Harvest windowNovember to January
Varietynot yet recorded
Altitudenot yet recorded
Moisturenot yet recorded
Water activitynot yet recorded

The Q score is issued with its scoresheet, which is attached to the offer. Samples are drawn from this lot, two from the same draw: one to you, one held against the shipment.

Request a sample of KB-2627-04

Sidama Bensa natural G1. Two samples are drawn from the same lot: one is sent to you, one is held against the shipment.

We use these details to reply to your request. Privacy.

Where this lot is on the journey.

The same eight stages for every lot, from the coffee journey. A stage with no record says so. The voyage sensor record is in build and shows no reading.

  1. 1. Cherry and farmNot yet recorded

    Woreda Bensa, Sidama. Harvest November to January. Altitude not yet recorded. Variety not yet recorded.

  2. 2. ProcessingNot yet recorded

    Natural. Drying and days on the bed: not yet recorded.

  3. 3. Milling and gradingNot yet recorded

    Grade G1, screen 14+. Defect count: not yet recorded.

  4. 4. Lab read 1 (origin)Not yet recorded

    Cup score 86 to 87 · range. Moisture not yet recorded. Water activity not yet recorded. Scoresheet attached to the offer.

  5. 5. Addis Ababa export prepUpcoming

    Phytosanitary certificate, certificate of origin, ECX grade certificate, bill of lading.

  6. 6. Djibouti FOBUpcoming

    About 900 km from Addis Ababa to Djibouti. Road takes 2 to 4 days, rail 24 to 36 hours. FOB handover.

  7. 7. Ocean transit In buildUpcoming

    Sealing spec runs today: hermetic liners, desiccant sized to the load, moisture checked. Voyage sensor record: in build.

  8. 8. Landing lab read 2 and deliveryUpcoming

    Moisture and water activity read again on landing and compared with the approved sample. Landing read: not yet recorded.

Looking for something close to this?

Send the brief and we come back with the lots that actually fit it, and the documentation behind each one.